commercial projects
malibu beach inn, Malibu Pier, and State Parks Project
Excavation and pouring of concrete sidewalk & wall footing as first phase of creating a public beach access route.
Malibu Farm
Restaurant remodel on Malibu Pier.
Ninongs Restaurant
Northridge
Commercial restaurant space remodel.
public works project
Installed new 240 ft long sewer line.
Installed (2) new manholes @ 12’ deep and sewer laterals.
Installed new gas line and laterals.
Repaired City street.
Asphalt slurry street repair throughout.
Hooters Staples Center
Concrete Patio addition with new fire features, concrete wall, and glass enclosure.